{"id":20083,"date":"2016-07-14T10:00:05","date_gmt":"2016-07-14T08:00:05","guid":{"rendered":"https:\/\/www.saertex.com\/?p=20083"},"modified":"2025-11-26T15:47:43","modified_gmt":"2025-11-26T14:47:43","slug":"saertex-expands-capacities-at-headquarters-in-saerbeck","status":"publish","type":"post","link":"https:\/\/www.saertex.com\/us\/blog\/2016\/07\/14\/saertex-erweitert-kapazitaeten-am-stammsitz-in-saerbeck\/","title":{"rendered":"SAERTEX expands capacity at its headquarters in Saerbeck"},"content":{"rendered":"<p class=\"translation-block\">Saerbeck - SAERTEX is expanding its production area at the Saerbeck site by a further 10,000 square meters to a total of more than 50,000 square meters. District Administrator Dr. Klaus Effing, Saerbeck's Mayor Wilfried Roos, SAERTEX founder Bruno Lammers and his two sons Simon and Klaus Lammers, who recently joined the management team, performed the symbolic ground-breaking ceremony on Tuesday, July 12, 2016.<\/p>\n<p class=\"translation-block\">\"We hope that the new hall can be completed by the beginning of 2017,\" said Bruno Lammers in a short speech in front of numerous invited guests. At the same time, Bruno Lammers made a clear commitment to the Saerbeck site: \"The SAERTEX Group is growing continuously and we are investing in our future - especially here in Saerbeck. The new production building is a milestone for us and will further improve our productivity and delivery performance for our customers.\"<\/p>\n<p class=\"translation-block\">The new production hall is being realized by the engineering office Hoff from Gronau. The plant technology is distributed over two levels to improve the automation of the production processes. The particular challenge here is that the ceiling has to bear very high loads of up to two tons per square metre. 9,000 m2 of production space and 1,400 m2 of storage and shipping space are planned for the plant expansion in order to meet the ever-increasing demand for textile reinforcement materials for lightweight construction and the energy transition.<\/p>","protected":false},"excerpt":{"rendered":"<p>SAERTEX\u00ae Continues to Expand at Its Headquarters in Saerbeck \u2013 Saerbeck \u2013 SAERTEX is expanding its production space at its Saerbeck site by an additional 10,000 square meters, bringing the total to more than 50,000 square meters. District Administrator Dr. Klaus Effing, Saerbeck Mayor Wilfried Roos, SAERTEX founder Bruno Lammers, and his two sons, Simon and Klaus Lammers\u2014who were recently promoted to the executive board\u2014performed the symbolic groundbreaking ceremony on Tuesday, July 12, 2016. \u201eWe hope that the new facility can be completed by early 2017,\u201c said Bruno Lammers in a brief speech before numerous invited guests. At the same time, Bruno Lammers made a clear commitment to the Saerbeck location: \u201eThe SAERTEX Group is growing steadily, and we are investing in our future\u2014especially here in Saerbeck. The new production facility is a milestone for us and will further improve our productivity and delivery performance for our customers.\u201c The new production hall is being constructed by the engineering firm Hoff from Gronau. The plant equipment will be distributed across two levels to improve the automation of production processes. The particular challenge here is that the ceiling must bear very high loads of up to two metric tons per square meter. The plant expansion is planned to include 9,000 m\u00b2 of production space and 1,400 m\u00b2 of storage and shipping space to meet the steadily rising demand for textile reinforcement materials for lightweight construction and the energy transition.<\/p>","protected":false},"author":15,"featured_media":20084,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"content-type":"","footnotes":""},"categories":[402],"tags":[],"competences":[],"brands":[],"class_list":["post-20083","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-press-release"],"acf":{"news_contact":"","news_video_youtube":"","project_subheadline":"SAERTEX\u00ae baut am Stammsitz in Saerbeck weiter aus","project_gallery":false,"project_gallery_height":450,"project_gallery_effect":"coverflow"},"_links":{"self":[{"href":"https:\/\/www.saertex.com\/us\/wp-json\/wp\/v2\/posts\/20083","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.saertex.com\/us\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.saertex.com\/us\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.saertex.com\/us\/wp-json\/wp\/v2\/users\/15"}],"replies":[{"embeddable":true,"href":"https:\/\/www.saertex.com\/us\/wp-json\/wp\/v2\/comments?post=20083"}],"version-history":[{"count":0,"href":"https:\/\/www.saertex.com\/us\/wp-json\/wp\/v2\/posts\/20083\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.saertex.com\/us\/wp-json\/wp\/v2\/media\/20084"}],"wp:attachment":[{"href":"https:\/\/www.saertex.com\/us\/wp-json\/wp\/v2\/media?parent=20083"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.saertex.com\/us\/wp-json\/wp\/v2\/categories?post=20083"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.saertex.com\/us\/wp-json\/wp\/v2\/tags?post=20083"},{"taxonomy":"competences","embeddable":true,"href":"https:\/\/www.saertex.com\/us\/wp-json\/wp\/v2\/competences?post=20083"},{"taxonomy":"brands","embeddable":true,"href":"https:\/\/www.saertex.com\/us\/wp-json\/wp\/v2\/brands?post=20083"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}